Wings are on.
Stefan helped torque the bolts.
Attaching the fuel vent, fuel lines, and aileron push pull rods.
Building the fairings for the gap between the wings and fuselage.
Installing fairings.
Thanks to friends for helping turn the plane around in the hangar.
Preparing the fairing attach points before attaching the wings.
Stefan built a stand to support the plane since we didn't have the wheels yet.
Hooking up the aileron push pull rods.